HomeNews News How To Order Custom Size Security Doors For Construction Projects?

How To Order Custom Size Security Doors For Construction Projects?

2026-03-29

When a building project requires a non-standard entrance, the ordering process needs to be more precise than a simple size selection. A door that looks right on a drawing can still create delays on site if the rough opening, frame depth, swing direction, hardware position, and finish details are not confirmed early enough. That is why many developers, contractors, and project buyers treat the door package as part of the wider coordination process for construction materials, not as a last-minute decorative item. Industry research shows that rework can consume a meaningful share of project cost, and poor communication is one of the main drivers behind that loss. Clear specifications at the ordering stage reduce that risk.

ARTY focuses on entrance door manufacturing with in-house design, production, sales, and after-sales support. According to its company profile, the production base covers nearly 40,000 square meters and supports a professional design and R&D team. Its product range includes armored doors, Copper Doors, Modern Doors, Steel-Aluminum Doors, and Fire Rated Doors, which gives project teams more flexibility when matching performance needs with architectural style.

Start With The Opening, Not The Catalog

For a successful order, the first step is to confirm the actual wall opening and installation conditions. In door terminology, the rough opening is the wall opening into which a frame is installed. That dimension is different from the nominal door leaf size and different again from the finished frame size. If the project team sends only an approximate width and height, manufacturing may still be forced to pause for clarification.

At this stage, the project file should include:

  • rough opening width and height

  • wall thickness

  • frame type

  • inward or outward swing

  • left-hand or right-hand opening

  • threshold requirement

  • lock and handle location

  • finish and color requirement

  • quantity by type and floor area

This is the most practical way to define a made to measure entry door without creating confusion between architectural drawings and factory production data.

Confirm Which Door Structure Matches The Project

Not every steel door, security door option is suitable for the same application. Apartment entries, villa entrances, and mixed-use developments often require different panel structures, face materials, hardware systems, and visual finishes. ARTY’s product pages show that customized sizes are available across several models, while door leaf thickness on some stainless steel security doors is listed in the 80 mm to 110 mm range. OEM and ODM production are also supported, which is useful when a project has its own design language or finish schedule.

A good supplier discussion should cover more than appearance. It should also review expected use frequency, weather exposure, locking requirements, corrosion conditions, and whether the entrance belongs to a residential tower, private villa, office, or hospitality setting.

Check Compliance Before Production Approval

For external pedestrian doors in many markets, performance and compliance need to be checked before mass production starts. In Europe, external pedestrian doorsets are covered by EN 14351-1 under the Construction Products Regulation framework. That means project teams should define the target market first, then align performance documentation, test scope, and technical file requirements accordingly.

A practical review list is shown below.

ItemWhy It Matters
Size schedulePrevents mismatch between drawing and production
Opening directionAffects frame design and hardware position
Material selectionInfluences durability, corrosion resistance, and appearance
Locking systemSupports safety and access control goals
Finish approvalEnsures consistency across the project
Compliance targetHelps align testing and documentation
Packaging methodReduces transit damage for bulk shipments

Send A Complete Door Schedule

For a custom security door for building project, the most efficient approach is to send a full door schedule rather than a single inquiry line. The schedule should group identical doors together and separate special units such as double leaf entries, oversized lobby doors, and decorative statement entrances. This lets the factory review engineering feasibility, estimate lead time accurately, and prepare shop drawings faster.

A strong inquiry package usually includes architectural elevations, opening list, quantity summary, hardware preference, surface finish reference, and target shipping date. When this package is complete, revisions become easier to manage and production planning becomes more stable.

Review Samples, Drawings, And Production Details

Before deposit and production release, ask for shop drawing confirmation. This is where many issues are solved early: handle height, hinge visibility, frame section, panel pattern alignment, lock position, and side clearance. ARTY highlights customized sizing and multiple finish directions across its security and luxury entrance door lines, which is useful for projects that need both protection and façade consistency.

For premium developments, material and finish samples are also important. A photographed color chip is rarely enough for final approval, especially when the entrance door is part of the architectural identity of the building.

Plan Lead Time Around Site Conditions

Door delivery should match the project sequence. Steel door frames and finished door leaves should arrive when opening conditions, wall readiness, and related trades are sufficiently coordinated. Steel Door Institute guidance notes that surrounding rough trade work should be completed before installation of factory-finished products. That is a practical reminder for site managers trying to protect finished surfaces and avoid unnecessary touch-up work.

The best ordering strategy is not simply to buy early. It is to lock the technical details early, then schedule manufacturing and shipment around site readiness.

Why ARTY Fits Custom Project Orders

ARTY combines manufacturing capacity, product variety, and customization support in one supply chain. Its factory profile emphasizes integrated design, development, production, and after-sales service, while its catalog covers several entrance categories that can serve different project styles and budgets. For buyers handling repeated units and special feature doors in the same development, that combination can simplify coordination and reduce sourcing fragmentation.

Ordering a custom security door successfully comes down to disciplined project information. Accurate measurement, clear schedules, compliance planning, and drawing approval will do more to protect budget and timeline than rushing into finish selection first. For teams managing new developments, renovations, or large entry packages, a manufacturer that understands both customization and production control can make the process far smoother from inquiry to installation.

Need a door schedule review or sizing check for your next development? Share your drawings, opening list, and finish requirements, and ARTY can help turn them into a practical production plan.